Looking for a solution to soft soils... Keller provided bearing capacity and slope stabilisation solution using rigid inclusions to assist with a proposed embankment widening, as part of Sydney Metro project.
The project
Sydney Metro is Australia’s largest public transport project which required ground improvement on a stretch of rail corridor adjacent to Cooks River, Campsie.
The challenge
Located adjacent to Cooks River, within a live and tight rail corridor, adjacent to a gas main and beneath high voltage power lines; the client did not have many cost-effective solutions to improve the soft soils beneath the proposed embankment widening. With the work area sloping towards the adjacent river and soft soils present up to 7m below ground level, environmental concerns from site run-off or creation of spoil remained a top priority when considering treatment options available.
The solution
A custom designed rigid inclusion scheme was the perfect solution for stabilising the soft soils beneath the future embankment. Requiring minimal equipment and producing less spoil, this solution met the project requirements, minimised potential environmental impacts and provided cost benefits to a happy client.